Moray East Offshore Wind Farm

Supply and installation of internal security fencing at the Moray East onshore substation. Chainlink and heavy-duty mesh panel systems delivered for Siemens Energy.
Principle Contractor
Siemens Energy Ltd
Location
Aberdeenshire
Programme
January 2024

Lowther were appointed by Siemens Energy Ltd to supply and install the internal security fencing package at the Moray East offshore wind farm onshore substation in Aberdeenshire.

Overview

The Moray East project required internal fencing across two systems: standard-height chainlink for the main internal zones and heavy-duty mesh panel fencing for specific high-security separation areas within the substation.

Works Undertaken

The internal fencing comprised 1,110 metres of 1,800mm galvanised steel chainlink, erected on a continuous A252 reinforced concrete strip foundation 450mm wide by 300mm deep with surface float finish and vertical joints every third bay to accommodate shrinkage.

A further 75 metres of 6,000mm Dulok 656 mesh panel fencing was installed on reinforced slab bases to the areas requiring the highest level of internal separation.

Related Projects

FENCING AND BARRIER SYSTEMS

Walney Extension Offshore Wind Farm

Lowther were appointed by Amey Utility Services Ltd to design and install the perimeter and internal security fencing package for the onshore substation serving the Walney Extension offshore wind farm near Heysham in Lancashire. Overview…

Read Case Study
FENCING AND BARRIER SYSTEMS

Triton Knoll Offshore Wind Farm

Lowther were appointed by Siemens Transmission and Distribution Ltd to design, supply and install the full CAT2 perimeter security fencing package at the Triton Knoll offshore wind farm onshore substation in Lincolnshire. Overview The Triton…

Read Case Study